Slice 1 Created with Sketch Beta. Slice 1 Created with Sketch Beta. Slice 1 Created with Sketch Beta. Slice 1 Created with Sketch Beta. Slice 1 Created with Sketch Beta. Slice 1 Created with Sketch Beta. Slice 1 Created with Sketch Beta. Slice 1 Created with Sketch Beta. Slice 1 Created with Sketch Beta. Slice 1 Created with Sketch Beta. Rectangle 212 + Rectangle 212 + Rectangle 212 Created with Sketch. Slice 1 Created with Sketch Beta. Slice 1 Created with Sketch Beta. Slice 1 Created with Sketch Beta. Slice 1 Created with Sketch Beta. Slice 1 Created with Sketch Beta. Slice 1 Created with Sketch Beta. Slice 1 Created with Sketch Beta. Slice 1 Created with Sketch Beta. Slice 1 Created with Sketch Beta. Twitter Created with Sketch Beta. Slice 1 Created with Sketch Beta. Slice 1 Created with Sketch Beta.

OTHER NEWS 27 Jan 2011

Steam Balance™ - concept that cuts annual operating cost in almost all industrial power plants

Pöyry is pleased to announce the new service called Steam Balance™, which is targeted for both new and existing industrial power plants. Steam Balance™ describes Pöyry's unique set of solutions covering everything that is needed to optimise combined heat and power (CHP) plant steam balancing.


Our service includes tools for dynamic simulation assisted power plant engineering, steam-net optimisation and a turn-key steam accumulator installation. Steam network dynamic simulation is a vital part of modern power plant engineering. With our steam-net optimisation services, it is possible to achieve EUR 0.2-2.0 million annual savings at almost all industrial power plants by optimising the steam balancing.


To read more, please click here