Infrastructure

Metro Warsaw, New construction of Line 2, Poland

Metro Warsaw, New construction of Line 2, Poland

warsaw, Poland

Project facts

Client: Consortium Alpine, FCC Spain, PBG, HBD, PRG, represented by Alpine Untertagebau GmbH, Munich

Project: new construction of the central section from Rondo Daszyñskiego station to Dworzec Wileñski station

Total length: 6.3 km with 7 stations

Project Period: 2008 - 2012

Services: Analysis and evaPertaining determination of quantitiesluation of concept design; Preliminary design planning; Contribution in competition dialog meetings; Preparation of the complete bill of quantities; Pertaining determination of quantities

The planned new construction of the underground railway system includes the central section of the new Line 2 running from east to west and crossing the existing Line 1 (north-south). The 2-track electrified line runs through two separate tunnels which also pass under the river Vistula.

A shield type tunnel boring machine is used and the cut and cover method is employed for the stations. The new construction is tendered as a "design and build" contract, including for instance shell construction and finishing, technical railway equipment and transport infrastructure. Basically, it comprises all disciplines, except the rolling stock.

In the project, Pöyry provided planning and consulting services for the client.